which is a great threat to the residents living downstream.Using high speed photography cooperated with positioning a group of labeled stakes
a set of test method was established and the whole process from erosion along the line to headcutting
the dam break characteristics of flood and landslide dam’s shape can be studied by this method.Experimental observation indicated that during landslide lake’s releasing period
the change of the channel shape is a gradual process
the erosion in the bottom is a headcutting process in the longitudinal orientation
both sides show gradual collapse process in the lateral orientation.With the experiment going on
scouring coefficient changes from large to small; from front to back of the landslide dam’s model
scouring coefficient changes from large to small.Breach is extending and alluvial fan become bigger and it extends towards both sides and ahead
at last discharge channel extends from breach to both sides
deepens in behind and finally forms an irregular trapeziform.
关键词
堰塞湖桩群定位法溃口变化冲刷系数溯源冲刷
Keywords
landslide lakesurvey method with stakeschange of burst orificescouring coefficientheadcutting